Glass mosaic construction 5 steps

[China Glass Network] 5 steps of glass mosaic construction:

1. Make sure that the construction surface is flat and clean. After the reference line is applied, apply cement or adhesive on the construction surface.

2. Paste the mosaics in order, leaving appropriate gaps between each sheet. Each time a sheet is placed, the mosaic is flattened with a wooden strip to ensure that each is compacted and fully bonded to the adhesive.

3. Tear the paper every other day or after the adhesive is dry. Wet the sticker with sponge water and wait until the sticker is completely wet before tearing the paper.

4, caulking. Use a tool to fill the gap with the grout or the original primer, white cement, etc.

5. Cleaning. Clean the excess sealant attached to the mosaic with a damp sponge and wipe it with a dry cloth to complete the construction procedure.

Plain Dyed Roller Blind Shade Curtains

The material of this curtains are 100% polyester fabric, its light and thin, good wear resistance, and good air permeability.

The Curtain Fabrics are include semi-blind and blind. Blind fabric's back coated with white or the color same with fabric. Many configuration options blackout, waterproof, protect UV according to the weather and your mood adjust brightness of the sun light.

Plain Dyed Curtain, Fabric Roller Shades, Waterproof Blackout Roller Blinds Curtains, Waterproof Roller Blinds, Waterproof Blinds For Bathroom Window

SHAOXING JEVA IMP.&EXP CO., LTD. , https://www.xhcurtain.com